Infinity Power and Hau Energy Raise $566 Million for Minya Solar Plant
Infinity Power and Hau Energy have secured up to $566 million in debt financing for a 1.2 GW solar plant in Minya, with $265 million arranged by the EBRD.

Infinity Power and Hau Energy announced securing up to $566 million in debt financing for the "Nefer Minya" solar plant project, according to Energy Global platform.
The European Bank for Reconstruction and Development (EBRD) arranged up to $265 million of the total financing.
The plant includes a solar capacity of 1.2 GW and a battery storage system with a capacity of 600 MWh. Located in the Minya Governorate, it has been described as the largest solar plant in Egypt and Africa.
The plant will sell electricity under a 25-year agreement, providing long-term revenue that supports the project's viability and financing.
What do these terms mean?
Debt Financing: Funds obtained by a company as loans that must be repaid with interest, typically used for large projects.
Gigawatt: A unit of measurement for electrical power capacity; one gigawatt equals one thousand megawatts, or one million kilowatts.
Megawatt-hour: A unit for measuring the amount of energy stored or consumed. A 600 MWh battery can store 600 MW of power for one hour.
Long-term Power Purchase Agreement: A contract that guarantees the producer will sell electricity to a buyer at an agreed-upon price over a period of years, reducing revenue risk.
Weekly Newsletter
Read between the lines before everyone else. Decode the most important economic, tech, and decision-maker movements in the region.. in 5 minutes every Saturday.











